top of page
Akenta Community Stormwater Upgrade
Birubi undertook improvement works to the stormwater crossing at the entrance to the Akenta Aboriginal Community near Port Lincoln for the Department of Infrastructure and Transport.
The works included:
-
Removal of existing 300mm stormwater pipe
-
Installation of new culvert system and headwalls to increase capacity of stormwater flow through this crossing.
-
Reinstatement of pavement on top of this crossing.
-
Reconstruction of table drains leading to stormwater crossing
Akenta Community Stormwater Upgrade
bottom of page