Marree Network Upgrade

Birubi completed the installation of approximately 4km of a new potable water network with almost 90 connections servicing the town of Marree from the newly installled desalination plant constructed by SA Waters major framework partner JHGO.

​

Birubi’s scope of work included:

  • Survey

  • Trenching, bedding, pipelaying and backfill for 3.5km of DN100 PVC and DICL watermains and OD63 PE pipe

  • All associated fittings, including 8 stop valves and 35 hydrants

  • Installation of 85 metered property connections

  • Supply and installation of concrete thrust blocks

  • Connection to the existing water main

  • Reinstatement of road pavements

  • Compaction testing and pressure testing

  • Disposal of spoil (including potentially contaminated soil from railway easement)